WEST CENTRAL RAILWAY |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
|
POSITION OF BILL PASSED FOR THE PERIOD OF 16/03/08
TO 31/03/08 |
||||||||
|
|
|
|
|
|
|
|
|
|
|
SR NO. |
NAME OF FIRM |
CA NO. and Date |
NAME OF WORK |
BILL NO. & DATE |
BILL RECD IN DIVISION |
BILLS SENT TO FINANCE |
REMARKS |
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
|
|
1 |
M/S LARSON AND TURBO LTD |
A/07-08/W/S/43 25/02/08 |
Reconditioing of wheel
burns removal of burns under DEN S BPL |
2nd on A/c bill No.
ET/2/227 of 17.03.08 |
17.03.08 |
28.03.08 |
|
|
|
2 |
M/s Larson and Toubro Ltd. |
A/06-07/W/S/40 of 26/02/07 |
Reconditioning of
Wheel burn and removal of burns under DEN(S) Section. |
10th on A/c bill No.
ET/10/228 of 05/03/08 |
17.03.08 |
28.03.08 |
|
|
|
3 |
Shri Laxmi Narayan Panthi |
A/2006-07/W/S/31 Dt.
09/01/07 |
ET:- Upgradation and
improvement to Running room. |
9th on A/C bill No. ET/9/224 of
12.03.08 |
17.03.08 |
29.03.08 |
|
|
|
4 |
Shri Jagdish Shau |
A/07-08/W/S/39 of 13/02/08 |
Loading & Unloading of
free rail and transportion of P.Way material in ET Yard. |
1st on A/C bill No.
ET/1/226 of 17.03.08 |
17.03.08 |
25.03.08 |
|
|
|
5 |
Shri Abdul Mughani Harda |
A/2007-08/W/S/28 Dt.
22/10/07 |
HD:- Repaair to boundary
wall at station and circulating area HD improvement to existing water stand
and provision of New water stand. |
6th on A/c bill No.
HD/6/151 of 17.03.08 |
18.03.08 |
20.03.08 |
|
|
|
6 |
Shri Gulab Singh Thakur |
A/2004-05/W/S/23 Dt.
03.12.04 |
TBR Km 758 to 747 Up Road
KNW-ET Sec. TRR Km 748 to 750 ET-NGP CTR 745.53 to 747 |
14th on A/c bill No.
ET/14/229 of 18.03.04 |
18.03.08 |
19.03.08 |
|
|
|
7 |
M/s National Guniting
Bhopal |
A/2006-07/W/S/29 Dt.
09.01.2007 |
KNW-ET Sec. Inturning of arches of jacktting abutments
and piers with extension of barrel length of |
13th on A/c bill No. ET/13/23o of
18.03.08 |
18.03.08 |
19.03.08 |
|
|
|
8 |
Shri O.P. Meghani |
A/05-06/W/S/41 OF 05/11/06 |
KNW-ET :- Replacement of
Arch Br. by exesting born length Br.
by Steel girder PSC Slab. |
13th on A/c bill No. HD/13/152 of 19.03.08 |
19.03.08 |
20.03.08 |
|
|
|
9 |
Shri Gulab Chand Agrawal |
A/05-06/W/S/42 OF 02.02.06 |
ET-KNW:- Replacement of
stone top bridges with present segement of RCC Box. Br.No. 713/1, 714/1 etc. |
6th on A/c bill No.
ET/6/231 of 24.03.08 |
25.03.08 |
26.03.08 |
|
|
|
10 |
M/s Neeraj Traders |
A/07-08/W/S/24 OF 31/08/07 |
ET:- Repairs to training
hostal building of D/Shed , Repair to asphalting road . |
6th on A/c bill No. ET/6/232
of 24.03.08 |
25.03.08 |
27.03.08 |
|
|
|
11 |
Shri Gulab Chand Agrawal |
A/07-08/W/S/44 OF
20.03.08 |
ET:- Provision of
filteration plant |
1st on A/C bill No.
ET/1/235 of 26.03.08 |
27.03.08 |
28.03.08 |
|
|
|
12 |
Shri Anil Kumar Jah |
A/07-08/W/S/45 OF
25.03.08 |
Improvement to water supply
by making pucca channel under ADEN ET |
1st on A/C bill No.
ET/1/234 of 26.03.08 |
27.03.08 |
28.03.08 |
|
|
|
13 |
M/s New Bombay Construction |
A/07-08/W/S/07 OF 01/06/07 |
Provision of PCC Haxagonal
pavig on various L-Xing |
6th on A/C bill No. Et/6/233 of
24/03/08 |
27.03.08 |
28.03.08 |
|
|
|
14 |
Shri Jagdish Shau |
A/07-08/W/S/35 OF 30.01.08 |
TLV:- Provision of Planan
interlocking building left over work. |
2nd on A/c bill No. HD/2/154
of 27.03.08 |
28.03.08 |
01.04.08 |
|
|
|
15 |
Shri Dinesh Kumar Choksey |
A/07-08/W/S/38 OF 12.02.08 |
Repair to embankment and
improvement of drainage in cutting between Km. 654 to 660 under ADEN/HD |
2nd on A/c bill No. HD/2/155
of 27.03.08 |
28.03.08 |
28.03.08 |
|
|
|
16 |
M/S VIKALP CONST. |
BPL/W/GUNA-SFY/A/S/149
of 22-01-08 |
Supply and stacking and loading
into hoppers of 50000 cum 65mm gauge M/c ballast at GUNA Depot under ADEN
GUNA. |
3RD ON A/C BILL
ADEN/GUNA/07-08/135 OF 14-03-08 |
17.03.08 |
17.03.08 |
|
|
|
17 |
M/S JEET CONST. |
BPL/W/GUNA-SFY/A/W/350
OF01-02-2008 |
ADEN GUNA SECTION- Repair
to peirs abutment and arches of bridge with painting grouting and RCC slab. |
2ND ON A/C BILL
ADEN/GUNA/07-08/136 16-03-2008 |
17.03.08 |
18.03.08 |
|
|
|
18 |
JAHOOR KHAN |
BPL/W/GUNA-SFY/A/W/283 OF
28.12.05 |
Providing fixing boundary
stome between badarwas panihar section(b) repair to boundary wall to prevent
emcshment in new track Štrack provision work in high cutting on svpi sec.(d)
MNV repair to the platform. |
9th and final svpi/07-08/89
dtd 15-03-2008 |
17.03.08 |
25.03.08 |
|
|
|
19 |
M/s Haridas Bhopal |
BPL/W/GUNA-SFY/A/W/353 of
26/02/08 |
Transportation of pway material for TSR(S)40 KM UNDER ADEN
SVPI |
IIND ON AC BILL
NO.ADEN/SVPI/90 OF 17.03.2008 |
18.03.08 |
19.03.08 |
|
|
|
20 |
Parth construction guna |
BPL/W/QUO/07-08/DEN/C/9
10/03/08 |
Drilling fixing and
transportation of joggled fish plate in the DEN central section |
IST ON A/C BILL NO. ADEN
/SVPI/07-08/91 OF 17-03-2008 |
18.03.08 |
25.03.08 |
|
|
|
21 |
Midla construction BINA |
BPL/W/GUNA-SFY/A/W/317 OF
6-11-2006 |
Maintenance of lifting
barrieer of engg gate through contractor agency under DEN C BPL SEC. |
4TH ON A/C BILL
NO.ADEN/SFY/07-08/118 DTD 17-03-2008 |
19.03.08 |
24.03.08 |
|
|
|
22 |
SHRI Mahesh kumar
vishwarkma |
BPL/W/GUNA-SFY/A/W/333 OF
02-07-2007 |
Repair and maintenance of
hand pump under den c bpl section |
IIND AND final bill
no.ADEN/SFY/07-08/119 OF 18-03-2008 |
19.03.08 |
25.03.08 |
|
|
|
23 |
shri RAKAB CHAND JAIN |
BPL/W/GUNA-SFY/A/S/146OF
24-09-2007 |
Supply and stacking and
loading into hoppers of 45000 cum 65mm gauge M/c ballast at SFY Depot under
ADEN SFY. |
4TH ON A/C BILL
NO.ADEN/SFY/07-08/120 OF 19/03/08 |
20.03.08 |
24.03.08 |
|
|
|
24 |
M/S LARSON AND TURBO LTD |
BPL/W/GUNA-SFY/A/W/347 of
28-01-2008 |
Recondining wheel burn
scobbed rail iow joing unde den central |
2ND ON A/C BILL NO.
ADEN/GUNA/07-08/141 OF 21-03-2008 |
24.03.08 |
< | ||